Turceni Thermal Power Plant, Units 3 to 6, Romania

With an installed capacity of 2310 MWe TPP Turceni is the largest power plant in Romania. The owner, S.C. Complexul Energetic Turceni S.A., determined to reduce the SO2 emission in order to follow the current environmental requirement.

Units 3 – 6 of the TPP Turceni will be equipped with wet flue gas desulphurisation systems, which come into operation till 2010. With this measure the reduction of the SO2 in the flue gas of more than 95% is calculated. In cooperation with a Japanese consultancy company Lahmeyer International conducts the consulting services from the design works to the final taking over.

ClientS.C. Complexul Energetic Turceni S.A.
LocationRomania
Services Period2006 – 2010
Technical Data
Power Plant Units 3-6
  • Fuel:
Lignite
  • Nominal Load:
4 x 330 MWe
  • First Start Up:
1980 - 1985
  • No.of Flue Gas
    Desulphurisation Plants:
4
  • Type:
Wet
  • Efficiency:
> 95%
  • SO2 Outlet:
< 200mg/Nm3
  • Additive:
Limestone
  • Product:
Gypsum
Services
  • Preparation of basic design
  • Preparation of bidding documents
  • Supervision of implementation
  • Commissioning and take over
  • Project quality assurance and control