Banner

Energie

Technical Consultancy Services for the 19.2MW Trikorfo Wind Farm

Alpha Bank AE mandated Lahmeyer International as independent wind and technical advisor for the Wind Energy Yield Assessment, the Engineering Due Diligence, the Construction Monitoring and the five (5) years Operation Monitoring of the 19.2 MW Trikorfo wind farm.mehr


Independent Engineering Services for 70 MWp PV Salvador Project, Chile

Lahmeyer has been assigned to take the role of Lender’s Engineer for the PV Salvador Project. The project is located in the Atacama Desert (Chile) and consists of 70 MWp of c-Si modules, mounted on single-axis tracking structures, both provided by SunPower, and outdoor inverters. Lahmeyer has performed a full technical Due Diligence (leading to a successful financial close) and is currently monitoring the construction phase. mehr


Independent Engineering Services for 30 MWp La Huayca PV Project, Chile

Lahmeyer has been assigned to take the role of Lender’s Engineer for the La Huayca PV Project. The project will be located in the Atacama Desert (Chile) and will consist of 30 MWp of c-Si modules, mounted on fixed structures, and outdoor inverters. Lahmeyer has performed a full technical Due Diligence (leading to a successful financial close) and is currently monitoring the construction phase.mehr


Technical Advisory Services for PV Portfolio in Spain, France, Italy, Bulgaria and Greece

Lahmeyer has been assigned to take the role of Lender’s Engineer for the La Huayca PV Project. The project will be located in the Atacama Desert (Chile) and will consist of 30 MWp of c-Si modules, mounted on fixed structures, and outdoor inverters. Lahmeyer has performed a full technical Due Diligence (leading to a successful financial close) and is currently monitoring the construction phase.mehr


Owner’s Engineer for the Implementation of Different RE Systems in Ghana

The Client intends to realize a Renewable Energy Development Plan (REDP), developing wind farms and solar power plant projects. These developments are separated into two phases: Phase 1: For the solar power components, Lahmeyer International is preparing a feasibility study, Tender Documents and the basic design for two PV plants with a total of 12 MW. For a Concentrating Solar Power plant, Lahmeyer is preparing a feasibility study as well as supervising the current construction of a 2 MW PV plant. Phase 2: The implementation of the wind farm and the PV plants will be supported by Lahmeyer International, which includes a design review, project management and construction supervision for the two wind farms, each between 50 and 75 MW, and two further PV plants.mehr


Lender’s Engineer for a 17 MW Solar Tower Power Plant in Spain – GEMASOLAR

Lahmeyer was appointed by Grupo Banco Popular, as leader of a group of banks, to carry out a technical Due Diligence for the installation of a 17 MW solar tower power plant in Spain. The power plant will be associated with the installation of a large size molten salt thermal storage facility, which will allow it to operate for over 6,000 hours per year. The scope of the services was primarily connected with the verification of the estimated annual energy yield of the plant, and the influence of the technical parameters on the economic feasibility of the project. It was also necessary to review the permits and licenses which are required for the project’s development, and to determine and evaluate the main project risks. Following the completion of the Due Diligence process, Lahmeyer was …mehr


Technical Consultancy Services for 141.35MW EDF EN Hellas portfolio

EDF Energies Nouvelles is a leading producer of electricity from renewable energy sources in a worldwide basis. The company through its subsidiary EDF EN Hellas S.A. has a strong presence in Greece both in the wind market.mehr


Sie sehen Artikel 1 bis 7 von 157
<< Erste < Vorherige 1-7 8-14 15-21 22-28 29-35 36-42 43-49 Nächste > Letzte >>

Projektsuche

Folgen Sie uns:LinkedInLahmeyer Blog