Studies, Tender and Final Design

Assiut, Egypt

Since its commissioning in 1902, the Assiut Barrage has played a key role in Egypt’s food self sufficiency. Today the barrage supplies up to 440 m³/s of water through its head regulator to irrigate some 690,000 hectares of land along the left bank of the Nile stretching some 300km from Assiut to the outskirts of Cairo.more


Rehabilitation of the Upper Reservoir BS1 of the Pumped Storage Plant in Coo – Trois-Ponts, Belgium

The existing pumped storage plant Coo in Trois-Ponts has two upper basins (Coo 1 & Coo 2), both being located on Mont de Brume, and a single lower reservoir located at an ancient river bend of the Amblève River. The plant was commissioned in two stages, Coo 1 (1969) and Coo 2 (1978).more


Madhya Pradesh Irrigation Efficiency Improvement Project, India

The Asian Development Bank (ADB) is supporting the Madhya Pradesh Irrigation Efficiency Improvement Project (MPIEIP) that will achieve high irrigation efficiency and water productivity in two large irrigation schemes in Madhya Pradesh, India.more


Rolwaling Diversion Scheme, Nepal

The project lies at the base of the Higher Himalayas, about 100 km north-east of Kathmandu and 8 km south of the Chinese Tibetan border. The project will divert water during the dry season from the Rolwaling valley to the Upper Tamakoshi reservoir for hydropower generation.more


Upper Tamakoshi Hydroelectric Plant, Nepal

The project lies at the base of the Higher Himalayas, about 100 km north-east of Kathmandu and 8 km south of the Chinese Tibetan border.more


Engineering Consulting Services Phase 1, 2, 3 and 4 for Oni HPP Cascade on the River Rioni – Georgia

The Project is located in the Rioni River Basin in Northern Georgia. The objective of the Feasibility is to define optimum scheme and detail parameters for the implementation of Oni HPP Cascade, based on technical, geological, environmental and financial comparative analysis of different alternatives.more


Middle Bhotekoshi, Nepal

The Middle Bhotekoshi Hydroelectric Project is located in Sindhupalchowk District of Bagmati Zone of the Central Development Region. The Project is basically a run-of-river type scheme having the capacity of 102 MW (3 Francis turbine units) with the design discharge of 50.8 m³/sec and available gross head of 235 m.more


Displaying 1 to 7 of 10