National Load Dispatch Centre Modification Project, Sudan

For the control of the national HV power transmission network a new control system will be installed at the National Load Dispatch Centre providing the same functionality (SCADA/EMS and Network Applications (NA)) as the existing control system. The system currently in operation was commissioned in 2006 and shall be used in future as a backup system.

The new system will be installed in parallel to the existing one in the NLDC. Both systems will be operated in parallel for a certain time. The currently operated system will be dismantled and installed in a separate location at a later stage.

ClientNational Electricity Corporation (NEC)
LocationSudan
Services Period2008 – 2010
Technical Data
  • One complete SCADA system including Network Application (NA), Energy Management (EMS) functionality and complete hardware
  • Related SDH telecommunication equipment (STM-16) to connect the new SCADA/EMS to the NEC telecommunication system
Services
  • Review of existing interfacing concepts including co-ordination with other projects
  • Preparation of technical specifications and tender documents
  • Assistance in prequalification of Bidders
  • Assistance in tendering, tender evaluation and contract negotiation
  • Design review and approval
  • Factory acceptance tests
  • Installation phase / site supervision
  • Project acceptance and services during warranty period