Energy

Technical Advisory Services for Phase II of the Ouarzazate Solar Complex, Morocco

The Ouarzazate solar complex, with a total installed capacity of 500 MWt, will be developed in two phases. The first phase (Noor I) with a capacity of 160 MW is under construction; the second phase (Noor II and Noor III) will then bring the total capacity to about 340 MW. The tendering process for Noor II and III was launched in 2013, covering one CSP plant with parabolic trough technology with the potential for 3h of storage (Noor II), and one CSP tower plant with the potential for 3h of storage (Noor III). MASEN appointed Lahmeyer International as the technical advisor for each project, to manage and supervise the entire technical process including: the preparation of the tender documents (Requests for Proposal)); the technical evaluation of the tenders received; and assistance with th…more


Feasibility Study for 6 Wind-Diesel-Complexes on Kamchatka/Siberia, Russia

The International Finance Corporation (IFC), part of the World Bank Group, is financing a feasibility study for six (6) wind-diesel complexes in isolated settlements on Kamchatka peninsula in the Russian far east.more


Wind Energy: Development of Three Wind Farms in Sudan

Acknowledging the huge potential for renewable energies in Sudan, the Ministry of Electricity and Dams of Sudan (MED) intends to develop renewable energy power projects in order to promote sustainable development. In the initial stage, MED has foreseen to focus on wind energy projects and awarded a contract to Lahmeyer International as consultant for the development of the first three wind farms.more


PEGO Steam Power Plant, Portugal

Electicidade de Portugal, the state owned Portuguese utility, issued an invitation to purchase a 2 x 300 MW coal-fired power station at Pego by means of an international bid competition.more


Owner’s Engineer for PV Plants at Sports Complex Mineirão / Mineirinho, Brazil

CEMIG, electricity company of the state of Minas Gerais located in Belo Horizonte, proposed integrating PV technology within the 2014 World Cup (WC) Mineirão and Mineirinho sports facilities. CEMIG contracted Lahmeyer as Owner’s Engineer for the implementation of the Minas Solar 2012 project. The aim of the project was the installation of two large scale commercial photovoltaic power systems on the rooftops of the world cup Mineirão stadium and its smaller sibling, the Mineirinho gymnasium. The project locations presented some challenges due to their being in use and the extensive refurbishment works. Thus a tight integration within the construction process for the Main Contractor’s work was required, which resulted in a successful commissioning of the plants.more


Ekibastuz Power Plant Unit 3, Kazakhstan

The growing demand of electric power in Kazakhstan requires an adjustment of the generation capacity. Therefore the client JSC ‘Ekibastuz GRES-2’ intends the expansion and reconstruction of the Ekibastuz Power Plant SDPP-2 by the installation of the new power unit No. 3 with a capacity of more than 600 MWel. The power plant site is 38 km north-east of the city Ekibastuz, which is located in the Pavlodar region in the northeast of Kazakhstan. The power station is the start of the power line Ekibastuz-Kokshetau and uses a transmission voltage of 1,150 kV, the highest transmission voltage in the world. Currently the power plant already operates two units, each of them with a capacity of 500 MWel, which were commissioned in the years 1990 and 1993. The fuel is pit coal, which is delivered …more


Wind Energy: Feasibility Study at the Upper Nile Region in Egypt

In the year 2007, based on the results of the National Wind survey, the Government of Egypt (GoE) requested the Government of Japan (GOJ) to conduct a Feasibility Study on the development of a 200 MW wind farm at the promising wind power potential area in the Nile Valley near to Minya.more