Laúca River Diversion, Angola

The construction of two diversion tunnels and the diversion of the River Kwanza has created conditions for the subsequent construction of the dam for the 2,067 MW Hydropower Plant Laúca. In total, 1,021 m of tunnels, with an internal diameter of 14 m, were excavated by drill-and-blast. Rock support was provided by steel-fibre reinforced shotcrete and rock bolts.mehr


Laúca Main Works, Angola

The underground powerhouse of the 2,067 MW Laúca Hydropower Project is located approx. 2.4 km downstream of the dam. Six shafts (90 m height and 8 m diameter) below the intake towers located at the axis of the dam have been executed by using the raise-boring method and were lined with reinforced concrete. Most parts of the headrace tunnels and also the powerhouse cavern were executed by using conventional drill-and-blast method. Rock support consisted of fibre reinforced shotcrete, rock bolts and anchors. mehr


Mohale Tunnel, Lesotho

Der Mohale Tunnel ist Teil der Phase 1B des Lesotho Highlands Water Projektes und wurde gebaut, um Wasser vom Mohale Becken zum Katse Becken überzuleiten.mehr


Pumpspeicherkraftwerk Goldisthal, Deutschland

Das PSW Goldisthal im Thüringer Wald hat eine installierte Leistung von 1060 MW. Das Oberbecken ist ein ringförmiger Steinschüttdamm mit Asphaltoberflächendichtung. Die Maschinenkaverne beherbergt 4 Pumpturbinen/Generatormotoren. Das Unterbecken wird durch einen 67 m hohen Steinschüttdamm mit wasserseitiger Asphaltbeton- dichtung eingestaut. Zwei der vier Pumpspeichersätze können mit variabler Drehzahl gefahren werden. mehr