Tunnel Kreuzstraße, Tuttlingen
As part of the interstate road B 14 / B 311, a 950 m long tunnel made of exposed construction will be implemented. The tunnel will consist of a bi-directional dual lane rectangular tube. The tunnel will be equipped with a stopping bay located in the middle of the tunnel, the technical infrastructure will be installed in operation rooms located next to the stopping bay.
Client:
Regierungspräsidium Freiburg
Period:
1986 - 2008
Germany
Germany
Services:
- determination of basic criteria
- preliminary design and cost estimate
- design for permit application
- detailed design
- preparation of tender documents
- tender evaluation
Technical data:
- length of tunnel:950 m
- performance of fans:36 x 3 kW
- lighting:
- basic lighting:20kVA
- adaptation lighting:40 kVA