Qatar Power Transmission System Expansion - Phase VIII Project
The Qatar General Electricity & Water Corporation intends to implement the Qatar Power Transmission System Expansion - Phase VIII Project. The aim of the project is to expand and reinforce the existing transmission network around the greater Doha area.
Within this project consultancy services are required and Lahmeyer International is involved as Consultant for the implementation phase of the project covering substations and cable connection s of several voltage levels. The construction works were assigned to different Contractors, two for substations and four for cables.
Client:
Qatar General Electricity & Water Corporation (KAHRAMAA)
Period:
2007 - 2012
Services:
- Contract Management and Administration
- Engineering Review
- Factory Inspection and Acceptance Test
- Supervision of Construction Works
- Supervision of Site Testing and Commissioning
- Services during Warranty Period
Technical data:
Construction of new GIS Substations including a few extension of existing ones:
Double circuit XLPE underground cables:
Cable connections within S/S area
- 3x 220/66/11 kV
- 1x 132/66/11 kV
- 11x 66/11 kV
Double circuit XLPE underground cables:
- 220 kV (29 km)
- 132 kV (29 km)
- 66 kV (966 km)
Cable connections within S/S area