Vasilikos Power Station, Unit 5, Phase IV - CCGT, 220 MW
The Electricity Authority of Cyprus (EAC) has decided to increase its installed power generation capacity by two new combined cycle gas turbine power plants in the area of the existing Vasilikos Power Station.
The project, called Unit 5, Phase IV, will extend the already available power generation capacity of Vasilikos Power Station (Phases I to III) by one new combined cycle power block together with all auxiliary equipment.
The project, called Unit 5, Phase IV, will extend the already available power generation capacity of Vasilikos Power Station (Phases I to III) by one new combined cycle power block together with all auxiliary equipment.
Client:
Electricity Authority of Cyprus (EAC), Cyprus
Period:
2006 - 2011
Services:
- Arrangement:2 GT GE 6FA+E, 1 ST Alstom MT
- HRSG:NEM, 2 pressure, non-reheat, horizontal type
- Electric power (DO):222.0 MWel
- Efficiency (DO):49.5 %
- Live steam (DO):104.3 bar/548 °C
- Fuel:distillate oil, natural gas
Technical data:
- Design study
- EPC pre-qualification procedure
- Tender specification
- Contract negotiation
- Design review and approval
- Progress and design meetings
- Workshop inspections and tests
- Site supervision
- Home office backup services for site supervision
- Guarantee period