Vijayawada Thermal Power Station Stage 4, Unit 7 (660 MW, Supercritical)

Vijayawada Thermal Power Station Stage 4, Unit 7 (660 MW, Supercritical)
Lahmeyer International (LI) has been appointed for providing the I&C and contractual portion of the Tender Documents and the evaluation of the bids within a group of 4 consulting companies. During the implementation phase of the Project LI was responsible for the design approval, workshop tests and Site inspections related to the I&C equipment.

The feasibility study, which was prepared by LI and served as the main input for the appraisal of the Project by KfW and the Government of Andhra Pradesh, formed the basis for the Tender Documents.

Client:
Vattenfall Europe PowerConsult GmbH, Germany
Period:
2003 - 2008
Services:
  • Preparation of the technical specification for the I&C equipment
  • Preparation of the contractual portion of the Tender Documents based on FIDIC
  • Pre-bid meeting with bidders
  • Bid evaluation
Technical data:
  • Generation capacity:660 MWel
  • Main steam parameters:252 bar, 542 °C
  • Main steam mass flow:540 kg/s
  • Exhaust pressure:0.110 bar
  • Plant net efficiency:> 40 %
  • Fuel:domestic washed coal
  • Boiler type:once-through principle
  • Cooling system:natural draft wet cooling tower