Merowe Dam and Hydropower Plant

Merowe Dam and Hydropower Plant
The Merowe Dam Project is a multi-purpose infrastructure project located on the River Nile and provides energy, water for irrigation and flood protection. With an average discharge of approx. 2,300 m³/s, almost 6,000 GWh of energy are produced annually. In addition some 400,000 ha of agricultural land can be irrigated through the stored water.
Client:
Dams Implementation Unit (DIU)
Period:
2000 - 2013
Services:
  • Feasibility study
  • Environmental consultancy services
  • Review of tender design and tender documents
  • Review and supervision of additional geotechnical investigations
  • Updating of tender design and tender documents
  • Tendering, evaluation, negotiations and contracting
  • Construction design and review/approval of E&M design
  • Construction management, contract administration, construction and erection supervision (full QA)
  • Assistance during commissioning and defects liability period
Technical data:
  • Total length of dams 9,280 m

Largest concrete face rockfill dams
  • max. height 52 m
  • crest lengths 1,437 m und 4,364 m
  • volumen 6.1x106

Major earth core rockfill dam with cut-off wall
  • max. height 67 m
  • crest length 841 m

  • Cut-off wall length/depth 390 m/53 m
  • Spillway capacity 19,900 m³
  • Turbine type Francis
  • Number of units10
  • Installed capacity 1,250 MW
  • Rated net head 43 m
  • Powerhouse L/W/H 335 m/43 m/56 m
  • Penstock diameter 8.50 m
Department
Water
Spectrum
Hydropower and Hydraulic Structure Design
Country
Sudan