Fehmarn Belt Fixed Link
Review and evaluation of relevant cost for operation and maintenance including replacement cost for a cable-stayed bridge (rail/road) based on the financial analysis established in June 2004 (in joint venture).
Client:
Bundesrepublik Deutschland
Bundesministerium für Verkehr, Bau- und Wohnungswesen
Bundesministerium für Verkehr, Bau- und Wohnungswesen
Period:
2005 - 2005
Germany-Denmark
Germany-Denmark
Services:
Review and evaluation of operation and maintenance costs/replacement cost:
- Rail system components
- Overhead catenary system and traction power supply
- General power supply
- Signalling / Telekommunication
- Control centre/ SCADA
- Infrastructure components for railway tracks
Technical data:
Total length of bridge incl. ramps = approx. 20 km
Lengh of cable-stayed bridge = 3.208 m
Approach bridges on each side - span of each segment = 240 m
Upper level- motorway = 4 lanes
Lower level - railway = 2 tracks
Estimated construction costs = ca. 4,8 bn. €
Lengh of cable-stayed bridge = 3.208 m
Approach bridges on each side - span of each segment = 240 m
Upper level- motorway = 4 lanes
Lower level - railway = 2 tracks
Estimated construction costs = ca. 4,8 bn. €