Gas-fired Power Production in Europe including Carbon Capture System

Gas-fired Power Production in Europe including Carbon Capture System
Lahmeyer International was assigned to execute a project study to compare alternative concepts of combined cycle power plants with a capacity of 400 – 500 MWel based on the latest most cost efficient technology in three European countries (Germany, Middle Norway and Slovakia). Each option has been investigated with and without a carbon capture plant with respect to the plant performance. The considered carbon capture plant is designed as a post-combustion plant with an efficiency of 90 % CO2 capturing.
Auftraggeber:
Norsk Hydro ASA, Norway
Ausführungszeitraum:
2008 - 2008
Leistungen:
  • Plant design assumptions and terminal points
  • Plant layout and basic design concept
  • Carbon capture system
  • Performance calculations
  • Environmental considerations
  • Availability
  • Project time schedule
  • Payment schedule
  • IBL (Inside Battery Limits) cost estimation with/without CO2 capture plant
  • Specific OBL (Outside Battery Limits) cost estimation
  • Economic issues (taxes, fees, etc.)
Technische Daten:
  • Design:1 or 2 single-shaft power trains, 1 GT + 1 ST with a 3-pressure reheat HRSG
  • Fuel:natural gas
  • Net power output without carbon capture:1 x 420 MWel, 2 x 420 MWel
  • Net power output with carbon capture:1 x 330 MWel, 2 x 330 MWel
  • Estimated plant efficiency without CC:~57 %
  • Estimated plant efficiency with CC:~44 %
  • CO2 capture efficiency:90 %
Geschäftsbereich
Energie
Leistungsspektrum
Thermische Kraftwerke
Land
Norwegen