Geothermal Energy Sabalan Geothermal Power Project
In 2005 the Iranian Ministry of Energy - through the Iran Renewable Energy Organisation (SUNA) – decided to erect the first Iranian Geothermal Power Plant on the Sabalan Mountain in the Ardabil Province near Meshkinshahr.
In preparation of this project Iranian authorities have successfully completed exploratory surface studies followed by drilling explorations including three deep exploratory wells and two injection wells. The results of the investigations suggest a potential for geothermal power development in the order of 250 MW. The first geothermal power plant is intended to deliver some 55 MW of electrical energy.
The main objectives of the engineering consulting services are the provision of high-level technical expertise on geothermal technology – addressing the resource side as well as the power generation – and its transfer to Iranian experts.
In preparation of this project Iranian authorities have successfully completed exploratory surface studies followed by drilling explorations including three deep exploratory wells and two injection wells. The results of the investigations suggest a potential for geothermal power development in the order of 250 MW. The first geothermal power plant is intended to deliver some 55 MW of electrical energy.
The main objectives of the engineering consulting services are the provision of high-level technical expertise on geothermal technology – addressing the resource side as well as the power generation – and its transfer to Iranian experts.
Auftraggeber:
Islamic Republic of Iran, Ministry of Energy,
Iran Renewable Energies Organization
Iran Renewable Energies Organization
Ausführungszeitraum:
2006 - 2010
Leistungen:
- Preparation of specifications for the power plant
- Design of the Fluid Collection and Injection System
- Preparation of EPC tender documents
- Supervision of construction, erection, commissioning
- Supervision of operation power plant systems and production field for the first year of operation
Technische Daten:
- First geothermal power plant with a capacity of some 55 MWe
- Thermal water temperatures up to 230°C
- Two phase medium (steam and liquefied water)
- Flow rates up to 60 kg/sec per well
Geschäftsbereich
Energie
Leistungsspektrum
Erneuerbare Energien
Geothermische Energie
Geothermische Energie
Land
Iran