Implementation of Mymensingh Power Station Phase III

Implementation of Mymensingh Power Station Phase III
Rural Power Company Ltd.(RPC) is the Owner of the 4 x 35MW Gas Turbine Power Plant at Mymensingh, Bangladesh, one of the first BOO projects in the country. The plant was built in two phases of two Gas Turbine Generators each.

Within Phase III of the project the Owner intended to convert the existing Gas Turbine Power Plant into a Combined Cycle Power Plant thus increasing the electrical output from 140 MW to 210 MW without additional fuel consumption.
Auftraggeber:
Rural Power Company Limited, Bangladesh
Ausführungszeitraum:
2001 - 2007
Bangladesh
Leistungen:
Tender Period
  • Preparation of EPC Tender Documents
  • Bid Evaluation
  • Assist Owner in EPC-Contract Negotiations


Implementation Period
  • Project Management
  • Design Review
  • Factory tests
  • Training
  • Site supervision
  • Commissioning Supervision
  • Assist Owner during Guarantee period
Technische Daten:

Existing
  • Gas Turbine (Supplier/Type):GE / Frame 6 B
  • Output Phase I&II:4 x 35 MW net
  • Fuel:Natural Gas


Extension (Phase III)
  • HRSG’s steam flow:4 x 60 t/h HP / 11 t/h LP
  • Steam Cycle:1 x 70 MW, net



Geschäftsbereich
Energie
Leistungsspektrum
Privat finanzierte Projekte
Thermische Kraftwerke
Land